1. Advance rates of hard rock TBM's and their effect on project Economics;Alber;Tunnelling and Underground Space Technology,2000
2. Modelling tunnel boring machine performance by Neuro-Fuzzy methods;Alvarez Grima;Tunnelling and Underground Space Technology,2000
3. Attiko Metro SA, 1995a. Interstation Katehaki – Panormou: Geological – Geotechnical Data, Athens
4. Attiko Metro SA, 1995b. Interstation Katehaki – Panormou: General Construction Report, Athens
5. Barla, G., Pelizza, S., 2000. TBM tunnelling in difficult ground conditions. GeoEng 2000, Melbourne, 2000