1. Ameyaw, C., Mensah, S., and Arthur, Y. D. (2012). “Applicability of Bromilow’s time-cost model on building projects in Ghana.” In: Laryea, S., Agyepong, S. A., Leiringer, R. and Hughes, W. (Eds) Proc. 4th West Africa Built Environment Research (WABER) Conference, Abuja, Nigeria, pp. 881–888.
2. Arditi, D., Akan, G. T., and Gurdamar, S. (1985). “Reasons for delays in public projects in Turkey.” Construction Management and Economics, Vol. 3, No. 2, pp. 171–181, DOI: 10.1080/01446198500000013.
3. Bromilow, F. J. (1969). “Contract time performance: Expectations and the reality.” Building Forum, Vol. 1, No. 3, pp.70–80.
4. Bromilow, F. J. (1974). “Measurement and scheduling of construction time and cost performance in the building industry.” The Chartered Builder, Vol. 10, No. 9, pp. 79–82.
5. Bromilow, F. J., Hinds, M. F., and Moody, N. F. (1980). “Australian institute of quantity surveyors: Survey of building contract time performance.” The Building Economist, Vol. 19, No. 2, pp. 79–82.