Author:
Pham Vu Hong Son,Nguyen Ngo Luan
Funder
Ho Chi Minh City University of Technology, Vietnam National University Ho Chi Minh City, Viet Nam
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference37 articles.
1. Ayhan, M., Dikmen, I., & Talat Birgonul, M. (2021). Predicting the occurrence of construction disputes using machine learning techniques. Journal of Construction Engineering and Management, 147(4), 4021022. https://doi.org/10.1061/(asce)co.1943-7862.0002027
2. Badawy, M. (2020). A hybrid approach for a cost estimate of residential buildings in Egypt at the early stage. Asian Journal of Civil Engineering, 21(5), 763–774. https://doi.org/10.1007/s42107-020-00237-z
3. Bakhoum, M., Morcous, G., & El-Said, M. (1998). Estimation of quantities and cost of prestressed concrete bridges over the Nile in Egypt. Journal of Egyptian Society of Engineers/civil, 37(4), 17–32.
4. Bayram, S. (2017). Duration prediction models for construction projects: In terms of cost or physical characteristics? KSCE Journal of Civil Engineering, 21(6), 2049–2060. https://doi.org/10.1007/s12205-016-0691-2
5. Byerly, G. (1996). Ohio: Library and information networks. Library Hi Tech. https://doi.org/10.1108/eb048020
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献