Author:
Beşikci Umut,Bilge Ümit,Ulusoy Gündüz
Publisher
Springer Science and Business Media LLC
Subject
Industrial and Manufacturing Engineering,Management Science and Operations Research
Reference28 articles.
1. Alcaraz J, Marato C, Ruiz R (2003) Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms. J Oper Res Soc 54:614–626
2. Boctor FF (1993) Heuristics for scheduling projects with resource restrictions and several resource-duration modes. Int J Prod Res 31(11):2547–2558
3. Bouleimen K, Lecocq H (1998) A new efficient simulated annealing algorithm for the resource constrained project scheduling problem and its multiple mode version. In: Barbarosoğlu G, Karabati S, Ozdamar L, Ulusoy G (eds) Proceedings of the sixth international workshop on project management and scheduling 49:268–281
4. Brucker P, Drexl A, Mohring R, Neumann K, Pesch E (1999) Resource constrained project scheduling: notation, classification, models and methods. Eur J Oper Res 112:3–41
5. Goncalves JF, Mendes JJM, Resende MGC (2008) A genetic algorithm for resource constrained multi-project scheduling problem. Eur J Oper Res 189:1171–1190
Cited by
31 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献