Funder
National Natural Science Foundation of China
Natural Science Foundation of Hunan Province, China
Publisher
Springer Science and Business Media LLC
Reference46 articles.
1. Artigues, C., Leus, R., & Nobibon, F. T. (2013). Robust optimization for resource-constrained project scheduling with uncertain activity durations. Flexible Services & Manufacturing Journal, 25(1), 175–205.
2. Asta, S., Karapetyan, D., Kheiri, A., Özcan, E., & Parkes, A. J. (2013). Combining monte-carlo and hyper-heuristic methods for the multimode resource-constrained multi-project scheduling problem. Information Sciences, 373, 476–498. https://doi.org/10.1016/j.ins.2016.09.010
3. Besikci, U., Ulusoy, G., & Bilge, U. (2014). A combination of different resource management policies in a multi-project environment. International Conference on Industrial Engineering & Systems Management, IEEE.
4. Beşikci, U., Ümit, B., & Ulusoy, G. (2013). Resource dedication problem in a multi-project environment. Flexible Services & Manufacturing Journal, 25(1), 206–229.
5. Beşikci, U., Ümit, B., & Ulusoy, G. (2015). Multi-mode resource constrained multi-project scheduling and resource portfolio problem. European Journal of Operational Research, 240(1), 22–31.