1. Bougard, J. F. (1988): The mechanical pre-cutting method. Tunnelling Underground Space Technol. 3 (No. 2), 163?167.
2. Le Goer, Y. (1982): Le creusement des tunnels en site urbain par predecoupage mecanique. Travaux.
3. Lewis, W. E. (1951): Tunnel construction by peripheral sawing at the Fort Randall Reservoir, Pickstown, South Dakota. Bureau of Mines Information Circular, no. 7610, Unites States Department of the Interior, July 1951.
4. Wallis, S. (1990): High-speed rail hurdles in Italy. Tunnels Tunnelling 22 (No. 1), 33?36.