Abstract
AbstractThe publications on two-machine flow shop scheduling problems with job dependent storage requirements, where a job seizes a portion of the storage space for the entire duration of its processing, were motivated by various applications ranging from supply chains of mineral resources to multimedia systems. In contrast to the previous publications that assumed that the availability of the storage space remains unchanged, this paper is concerned with a more general case when the availability is a function of time. It strengthens the previously published result concerning the existence of an optimal permutation schedule, shows that the variable storage space availability leads to the NP-hardness in the strong sense even for unit processing times, and presents a polynomial-time approximation scheme together with several heuristic algorithms. The heuristics are evaluated by means of computational experiments.
Funder
Adam Mickiewicz University in Poznan
Publisher
Springer Science and Business Media LLC
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献