Publisher
Springer International Publishing
Reference12 articles.
1. Berlińska, J.: Scheduling for data gathering networks with data compression: Berlińska. J. Eur. J. Oper. Res. 246, 744–749 (2015)
2. Berlińska, J.: Scheduling data gathering with maximum lateness objective. In: Wyrzykowski, R. et al. (eds.) PPAM 2017, Part II. LNCS, vol. 10778, pp. 135–144. Springer, Cham (2018).
https://doi.org/10.1007/978-3-319-78054-2_13
3. Berlińska, J.: Heuristics for scheduling data gathering with limited base station memory. Ann. Oper. Res. (2019).
https://doi.org/10.1007/s10479-019-03185-3
. In press
4. Błażewicz, J., Kubiak, W., Szwarcfiter, J.: Scheduling unit-time tasks on flow-shops under resource constraints. Ann. Oper. Res. 16, 255–266 (1988)
5. Błażewicz J., Lenstra, J.K., Rinnooy Kan, A.H.G.: Scheduling subject to resource constraints: classification and complexity. Discret. Appl. Math. 5, 11–24 (1983)
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献