Author:
Ibrahimov Maksud,Mohais Arvind,Schellenberg Sven,Michalewicz Zbigniew
Publisher
Springer Science and Business Media LLC
Subject
Industrial and Manufacturing Engineering,Computer Science Applications,Mechanical Engineering,Software,Control and Systems Engineering
Reference32 articles.
1. Stadtler H, Kilger C (2008) Supply chain management. Springer, Berlin
2. Michalewicz Z, Fogel DB (2004) How to solve it: modern heuristics, 2nd edn. Springer, Berlin
3. Caccetta L, Hill SP (1999) Optimization techniques for open pit mine scheduling. In: International congress on modelling and simulation
4. Caccetta L, Hill S (2003) An application of branch and cut to open pit mine scheduling. J Glob Optim 27:349–365. doi: 10.1023/A:1024835022186
5. Bley A, Boland N, Fricke C, Froyland G (2010) A strengthened formulation and cutting planes for the open pit mine production scheduling problem. Comput Oper Res 37:1641–1647. doi: 10.1016/j.cor.2009.12.008
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献