Author:
Tyagi Satish,Vadrevu Sarat
Publisher
Springer Science and Business Media LLC
Subject
Industrial and Manufacturing Engineering,Computer Science Applications,Mechanical Engineering,Software,Control and Systems Engineering
Reference62 articles.
1. Morgan J, Liker J (2006) The Toyota product development system: integrating people, process, and technology. Productivity Press, New York
2. Tyagi SK, Choudhary A, Cai X, Yang K (2015) Value stream mapping to reduce the lead-time of a product development process. Int J Prod Econ 160(202):212
3. Shah R, Ward PT (2003) Lean manufacturing: context, practice bundles, and performance. J Oper Manag 21(129):149
4. Seth D, Gupta V (2005) Application of value stream mapping for lean operations and cycle time reduction: an Indian case study. Prod Plan Control 16(1):44–59
5. Singh B, Garg SK, Sharma SK (2011) Value stream mapping: literature review and implications for Indian industry. Int J Adv Manuf Technol 53(5-8):799–809
Cited by
27 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献