1. Adiri I, Frostig E, Rinnooy KAHG (2006) Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs. Nav Res Logist 38(2):261–271
2. Liu Y, Liu X, Zhao J (2008) Research on job-shop scheduling optimization method with limited resources. Int J Adv Manuf Technol 38(3–4):386–392
3. Graham RL, Lawler EL, Lenstra JK, Rinnooy AHG (1979) Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann Oper Res 5:287–326
4. Graves SC (1981) A review of production scheduling. Oper Manag 29(4):646–675
5. Pinedo ML (2008) Scheduling: theory, algorithms and systems. Prentice-Hall, Englewood Cliffs