Author:
Canessa Gianpiero,Moreno Eduardo,Pagnoncelli Bernardo K.
Abstract
AbstractIn this work, we consider a risk-averse ultimate pit problem where the grade of the mineral is uncertain. We derive conditions under which we can generate a set of nested pits by varying the risk level instead of using revenue factors. We propose two properties that we believe are desirable for the problem: risk nestedness, which means the pits generated for different risk aversion levels should be contained in one another, and additive consistency, which states that preferences in terms of order of extraction should not change if independent sectors of the mine are added as precedences. We show that only an entropic risk measure satisfies these properties and propose a two-stage stochastic programming formulation of the problem, including an efficient approximation scheme to solve it. We illustrate our approach in a small self-constructed example, and apply our approximation scheme to a real-world section of the Andina mine, in Chile.
Publisher
Springer Science and Business Media LLC
Subject
Electrical and Electronic Engineering,Control and Optimization,Mechanical Engineering,Aerospace Engineering,Civil and Structural Engineering,Software
Reference24 articles.
1. Amankwah H, Larsson T, Textorius B (2013) Open-pit mining with uncertainty: a conditional value-at-risk approach. In: Athanasios M, Angelo S, Christos KG, Jason P, Emmanuil S (eds) Optimization theory, decision making, and operations research applications. Springer, New York, pp 117–139
2. Artzner P, Delbaen F, Eber J-M, Heath D (1999) Coherent measures of risk. Math Finance 9(3):203–228
3. Caccetta L (2007) Application of optimisation techniques in open pit mining. Handbook of operations research in natural resources. Springer, New York, pp 547–559
4. Caccetta L, Hill SP (2003) An application of branch and cut to open pit mine scheduling. J Glob Opt
5. Coléou T (1988) Technical parameterization for open pit design and mine planning. In: Proceedings of the 21st APCOM symposium of the Society of Mining Engineers (AIME), pp 485–494
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献