Author:
Morales Nelson,Nancel-Penard Pierre,Espejo Nelson
Publisher
Springer Science and Business Media LLC
Subject
Electrical and Electronic Engineering,Control and Optimization,Mechanical Engineering,Aerospace Engineering,Civil and Structural Engineering,Software
Reference55 articles.
1. Altiti A, Alrawashdeh R, Alnawafleh H (2021). Open Pit Min. https://doi.org/10.5772/intechopen.92208
2. Asad M, Topal E (2011) Net present value maximization model for optimum cut-off grade policy of open pit mining operations. J Southern African Inst Min Metall 111:741–750
3. Bai X, Marcotte D, Gamache M, Gregory D, Lapworth A (2018) Automatic generation of feasible mining pushbacks for open pit strategic planning. J Southern African Inst Min Metall 118(5):515–530
4. Behnamian J (2017) Matheuristic for decentralized factories scheduling problem. Appl Mathem Modell 47:668–684
5. Bienstock D, Zuckerberg M (2009) A new LP algorithm for precedence constrained production scheduling. Optimization Online, 1–33
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献