Author:
Mittal Yash Kumar,Paul Virendra Kumar,Rostami Ali,Riley Michael,Sawhney Anil
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference74 articles.
1. Abowitz, D. A., & Toole, T. M. (2009). Mixed method research: Fundamental issues of design, validity, and reliability in construction research. Journal of Construction Engineering and Management,136(1), 108–116.
2. Adam, A., Josephson, P. E. B., & Lindahl, G. (2017). Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications. Engineering, Construction and Architectural Management,24(3), 393–406.
3. Afshari, H., Khosravi, S., Ghorbanali, A., Borzabadi, M., & Valipour, M. (2010). Identification of causes of non-excusable delays of construction projects. In International conference on e-business management and economics (pp. 42–46). International Economics Development and Reseach Center, Hong Kong.
4. Ahsan, K., & Gunawan, I. (2010). Analysis of cost and schedule performance of international development projects. International Journal of Project Management,28(1), 68–78.
5. Al-Hazim, N., Salem, Z. A., & Ahmad, H. (2017). Delay and cost overrun in infrastructure projects in Jordan. Procedia Engineering,182, 18–24.
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献