Funder
The Ministry of Research, Technology and Higher Education of the Republic of Indonesia
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference40 articles.
1. Arditi, D., & Pattanakitchamroon, T. (2006). Selecting a delay analysis method in resolving construction claims. International Journal of Project Management, 24(2), 145–155.
https://doi.org/10.1016/j.ijproman.2005.08.005
.
2. Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349–357.
https://doi.org/10.1016/j.ijproman.2005.11.010
.
3. Cheng, M.-Y., Chiu, C.-K., Chiu, Y.-F., Wu, Y.-W., Syu, Z.-L., Prayogo, D., et al. (2014). SOS optimization model for bridge life cycle risk evaluation and maintenance strategies. Journal of the Chinese Institute of Civil and Hydraulic Engineering, 26(4), 293–308.
4. Cheng, M.-Y., & Prayogo, D. (2014). Symbiotic organisms search: A new metaheuristic optimization algorithm. Computers & Structures, 139, 98–112.
https://doi.org/10.1016/j.compstruc.2014.03.007
.
5. Cheng, M.-Y., & Prayogo, D. (2017). A novel fuzzy adaptive teaching–learning-based optimization (FATLBO) for solving structural optimization problems. Engineering with Computers, 33(1), 55–69.
https://doi.org/10.1007/s00366-016-0456-z
.
Cited by
26 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献