Author:
Chiu Chun-Chih,Lai Chyh-Ming,Chen Chien-Ming
Funder
Ministry of Science and Technology, Taiwan
Publisher
Springer Science and Business Media LLC
Reference75 articles.
1. Ahn G, Park M, Park YJ, Hur S (2019) Interactive Q-learning approach for pick-and-place optimization of the die attach process in the semiconductor industry. Math Probl Eng 2019:1–8
2. Deng Y, Bard JF, Chacon GR, Stuber J (2010) Scheduling Back-end operations in semiconductor manufacturing. IEEE Trans Semicond Manuf 23(2):210–220
3. Song Y, Zhang MT, Yi J, Zhang L, Zheng L (2007) Bottleneck Station scheduling in semiconductor assembly and test manufacturing using ant Colony optimization. IEEE Trans Autom Sci Eng 4(4):569–578
4. Chen JC, Su L, Sun C, Hsu M (2010) Infinite capacity planning for IC packaging plants. Int J Prod Res 48(19):5729–5748
5. Fu M, Askin R, Fowler J, Haghnevis M, Keng N, Pettinato JS, Zhang M (2011) Batch production scheduling for semiconductor back-end operations. IEEE Trans Semicond Manuf 24(2):249–260
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献