Author:
Ghosh Bisweswar,Ali Samhar Adi,Belhaj Hadi
Abstract
AbstractFractured carbonate reservoirs are prone to premature water cut production at the early stage of recovery. Conventionally completed long horizontal wells, suffering from high water cut through fracture networks, need reliable and cost-effective treatment solutions to control water entry, without damaging oil-saturated segments. Protection of oil flow channels from polymer gel invasion could be a challenge in complex fractured reservoirs because of the enormity of the number of zones that may require damage protection. In this work, a chemical package system is developed, comprising three different chemical solutions. The first fluid is designed to protect the low-permeable oil-saturated zones by creating an impermeable barrier while keeping the water conductive fractures open, followed by a gelant, designed to invade, solidify, and seal off the water conductive fractures. The third treatment is designed for a complete dissolution of the protective barrier created by the first fluid. The effectiveness of this process is evaluated through a set of four core flood studies at reservoir conditions. It was observed that whereas the effective brine permeability could be reduced by 74–91%, oil effective permeability is reduced by 12–17% depending on the fracture aperture. The paper also discusses the key parameters to be addressed for successful field implementation of this technology.
Publisher
Springer Science and Business Media LLC
Subject
General Energy,Geotechnical Engineering and Engineering Geology
Reference37 articles.
1. Alaa AD et al (2008) Horizontal water shut-off for better production optimization and reservoir sweep efficiency (case study). Paper SPE 117066
2. Alaa AD et al (2013) Utilizing fiber optic enabled coil tubing telemetry in extended reach horizontal well mechanical rigless water shut-off (WSO) operation—case study. Paper SPE 149121
3. Al-Shabibi H et al (2012) Comprehensive diagnostic and water shut-off in open and cased hole carbonate horizontal wells. SPE-162287
4. Al-Zubail MA et al (2003) Rigless water shut-off experience in offshore Saudi Arabia. SPE-81443
5. Bedaiwi E et al (2009) Polymer injection for water production control through permeability alteration in fractured reservoir. NAFTA 60(4):221–231
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献