1. Baalousha H (2008) Water balance model for Ruataniwha Basin. Hawke’s Bay Regional Council. Technical report EMT 08/05
2. Baalousha H (2009) Ruataniwha Basin modelling. A steady state groundwater flow model. Hawke’s Bay Regional Council. Technical report EMT 09/06
3. Butler J, Zlotlink V, Tsou M (2001) Drawdown and stream depletion produced by pumping in the vicinity of a partial penetrating stream. Ground Water 39(5):651–659
4. Doherty J (2009) PEST: model-independent parameter estimation. Watermark Numerical Computing, Brisbane. http://www.sspa.com/pest . Accessed 15 May 2010
5. Dravid D, Cameron S (1997) Ruataniwha plains groundwater research 1996–1998. 1996/97 Interim report. Technical report no. EMI 9704. Hawke’s Bay Regional Council