Author:
Pantouvakis John-Paris,Manoliadis Odysseus G.
Publisher
Springer Science and Business Media LLC
Subject
Management of Technology and Innovation,Computational Theory and Mathematics,Management Science and Operations Research,Statistics, Probability and Uncertainty,Strategy and Management,Modeling and Simulation,Numerical Analysis
Reference26 articles.
1. Abeyasinghe, M.C., Greenwood, D.J. and Johansen, D.E. (2001). An efficient method for scheduling construction projects with resource constraints, International Journal of Project Management, 19(1), pp. 29–45.
2. Ahuja, H., Dozzi, S.P. and AbouRizk, S.M. (1994). Project management techniques in planning and controlling construction projects, 2nd edition, Wiley, New York.
3. Burgess, A.R. and Killebrew, J.R. (1962). Variation in activity level on a cyclical arrow diagram, Journal of Industrial Engineering, 13(2), pp. 76–83.
4. Davis, E.W. and Heidorn, G.E. (1971). An algorithm for optimal project scheduling under multiple resource constraints, Management Science, 27(2), pp. 803–816.
5. Davis, E.W. and Patterson, J.H. (1975). A comparison of heuristic and optimum solutions in resource constrained project scheduling, Management Science, 21, pp. 944–955.
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献