1. ÅF (2016) Project E4 Förbifart Stockholm, Förstärkningsanvisning. Unpublished data
2. Arghe F (2013) E4 Förbifart Stockholm FSE210 Arbetstunnel—Skärholmen—Ingenjörsgeologisk prognos 13.4 Bygghandling—Arbetshandling 2013-08-30 2B141001.doc [E4 Stockholm bypass FSE210 access tunnels—Skärholmen—Engineering geological prognose 13.5—Construction document …]. Technical report (in Swedish)
3. Arghe F (2016) E4 Förbifart Stockholm FSE209 Bergtunnlar—Skärholmen—Ingenjörsgeologisk prognos—Bergteknik Handling 13.5—Bygghandling 2015-03-04 (Rev B 2016-03-17) 2B141102-FSE209 [E4 Stockholm bypass FSE209 rock tunnels—Skärholmen—Engineering geological prognose—rock technical document 13.5—Construction document …].” Technical report (in Swedish)
4. Atlas Copco Rock Drills AB (2009) Atlas Copco Face drilling options Measurement While Drilling Technical specification. 9851 2456 01a 02/2009
5. Barr MV (1984) Instrumented horizontal drilling for tunnelling site investigations. Ph.D. Thesis, Imperial College of Science and Technology, London