1. T. Amezquita, R. Hammond, M. Salazar, B. Bras, Characterizing the remanufacturability of engineering systems, in Proceedings of ASME Advances in Design Automation Conference, DE-vol. 82, Boston, 17–20 Sept 1996, pp. 271–278
2. J.-J. Andreu, The remanufacturing process. Manchester Metropolitan University, Manchester, UK (1995)
3. BSI, BS 8887-220:2010 – Design for manufacture, assembly, disassembly and end-of-life processing (MADE) and BS 8887-2:2009 – Terms and definitions, BS 8887-1:2006 – General concepts, process and requirements. Produced by British Standards Institute technical product specification committee (TDW/004/0-/05 Design for MADE BSI), British Standards Publications, Southam (2010)
4. M. Ferguson, L. Toktay, The effect of competition on recovery strategies. Prod. Oper. Manag. 15(3), 351–368 (2006)
5. R. Geyer, T. Jackson, Supply loops and their constraints: the industrial ecology of recycling and reuse. Calif. Manag. Rev. 46(2), 55–73 (2004)