The Role of Geological Investigations for Dam Siting: Mosul Dam a Case Study

Author:

Sissakian Varoujan K.,Adamo Nasrat,Al-Ansari NadhirORCID

Abstract

AbstractDams are engineering structures constructed for different purposes. They are of different sizes, shapes and types. In all cases, many essential studies should be carried out before deciding the location, type and size of the dam. Among those studies is the geological investigations which should be carried out to deduce the geological conditions in the most relevant site, depth of the foundations and their types, cut-off depth, type of the available construction materials, and type of the expected geological hazards. Without proper geological investigations, the siting of a dam will cause serious hazards during construction and during commissioning of the dam. In this study, Mosul Dam case is considered as the consequences of inadequate geological investigations which were carried out by the contractor and supervised by Swiss Consultant. The location of the dam site and its foundations are built over a highly karstified area, where gypsum and limestone beds are exposed and exist deep under the ground surface, and even deeper than the foundations. Accordingly, grouting treatment was carried out and still on going, but all the attempts to have a safe and relevant dam were in vain. In this study we have provided the essential studies which should be included during the geological investigation to have a safe and sound dam.

Publisher

Springer Science and Business Media LLC

Subject

Geology,Soil Science,Geotechnical Engineering and Engineering Geology,Architecture

Reference36 articles.

1. Adamo N, Al-Ansari NA (2016) Mosul Dam full story: engineering problems. J Earth Sci Geotech Eng 6:213–244

2. Adamo N, Al-Ansari NA, Laue J Sven, Knutsson S, Sissakian V (2017) Risk management concepts in dam safety evaluation: Mosul Dam as a case study. J Civ Eng Archit 11:635–652

3. Al-Ansari NA, Adamo N, Issa IE, Sissakian V, Knutsson S (2015a) Geological and engineering investigations of the most dangerous dam in the world. ScienPress, London

4. Al-Ansari NA, Adamo N, Issa IE, Sissakian V, Knutsson S (2015b) Mystery of Mosul Dam the most dangerous dam in the world: karstification and Sinkholes. J Earth Sci Geotech Eng 5:33–45

5. Al-Ansari N, Adamo N, Sissakian V, Knutsso NS, Laue J (2017) Is Mosul Dam the most dangerous dam in the world? Review of previous work and possible solutions. Engineering 9:801–823

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3