1. XU Bin-shi. Theory and technology of equipment remanufacturing engineering [M]. Harbin, China: National Defense Industry Press, 2007. (in Chinese)
2. SONG Shou-xu, LIU Ming, KE Qing-di, LIU Guang-fu. Components optimization design for remanufacturing based on residual strength [J]. Journal of Mechanical Engineering, 2013, 49(9): 121–127. (in Chinese)
3. JIANG Juan-ping, LIANG Gong-qian, ZHANG Shu-juan. Research on requirement analysis of aero engine turbine blade for proactive remanufacturing [J]. Aeronautical Manufacturing Technology, 2014(1): 118–122. (in Chinese)
4. LIU Guang-fu, LIU Tao, KE Qing-di. Time interval decision-making methods for proactive remanufacturing product based on game theory and neural network [J]. Journal of Mechanical Engineering, 2013, 49(7): 29–35. (in Chinese)
5. WU Cheng-wei, GUAN Zhen-qun, GUO Xing-lin. Fatigue reliability analysis of blades of large centrifugal compressor [J]. Equipment Manufacturing Technology, 2008(8): 1–3. (in Chinese)