1. Kwon, H. B., Kim, T. Y., Kwon, I. H., Lee, D. H. and Kim, M. S., 2002, “The Numerical Simulation of the Pressure Wave for G7 Test Train in the Tunnel,”Journal of the Korean Society for Railway, Vol. 5, No. 4, pp. 260–266.
2. Lee, T. H., Park, C. S. and Shin, J. R., 2003, “Train Performance Simulation Program for Korea High Speed Railway System,”Journal of the Korean Society for Railway, Vol. 6, No. 2, pp. 100–107.
3. Lee, T. H., Park, C. S. and Shin, I. R., 2004,, “Train Performance Simulation and Evaluation for Kore High Speed Train,”Journal of the Korean Society for Railway, Vol. 7, No. 2, pp. 120–124.
4. Nam, S. W. and Kwon, H. B., 2004, “Theoretical x-t Diagram Analysis on Pressure Waves of High Speed Train in Tunnel,”Journal of the Korean Society for Railway, Vol. 7, No. 3, pp. 200–207.
5. Nam, S. W., 2004, “A Study on the Characteristics of Internal and External Pressure Variation for KTX,”Journal of the Korean Society for Railway, Vol. 7, No. 1, pp. 26–31.