1. Bai, S. X. and Elhafsi, M. (1993), ?Real-Time Scheduling of a Manufacturing System with Non-Resumable Setup Changes,? Research Report 93-28. Department of Industrial and Systems Engineering. University of Florida.
2. Bai, S. X. and Elhafsi, M. (1996), ?Transient and Steady State Analysis of a Manufacturing System with Setup Changes,? Journal of Global Optimization 8, 349?378.
3. Buzacott, J. A. and Ozkarahan, I. A. (1983), ?One- and Two-Stage Scheduling of Two Products with Distributed Inserted Idle Time: The Benefits of a Controllable Production Rate,? Naval Research Logistics Quarterly 30, 675?696.
4. Caramanis, M., Sharifnia, A., Hu, J. and Gershwin, S. B. (1991), ?Development of a Science Base for Planning and Scheduling Manufacturing Systems,? Proceedings of the 1991 NSF Design and Manufacturing Systems Conference, The University of Texas at Austin, January 9?11, 1991.
5. Carreno, J. J. (1990), ?Economic Lot Scheduling for Multiple Products on Parallel Identical Processors,? Management Science 36, 348?358.