Author:
Buzacott J. A.,Ozkarahan I. A.
Reference8 articles.
1. “A float glass scheduling problem,” Working Paper 81-024, Department of Industrial Engineering, University of Toronto, September 1981, presented at ORSA/TIMS Houston, October 1981.
2. Economic Lot Size Determination in Multi-Stage Assembly Systems
3. Work measurement: some research studies, Macmillan, New York, 1968.
4. An integrated cutting tool life, batch quantity model
5. The Economic Lot Scheduling Problem (ELSP): Review and Extensions
Cited by
28 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献