Abstract
AbstractThis paper addresses the unrelated parallel machine scheduling problem with sequence and machine dependent setup times and machine eligibility constraints. The objective is to minimize the maximum completion time (makespan). Instances of more than 500 jobs and 50 machines are not uncommon in industry. Such large instances become increasingly challenging to provide high-quality solutions within limited amount of computational time, but so far, have not been adequately addressed in recent literature. A hybrid genetic algorithm is developed, which is lean in the sense that is equipped with a minimal number of parameters and operators, and which is enhanced with an effective local search operator, specifically targeted to solve large instances. For evaluation purposes a new set of larger problems is generated, consisting of up to 800 jobs and 60 machines. An extensive comparative study shows that the proposed method performs significantly better compared to other state-of-the-art algorithms, especially for the new larger instances. Also, it is demonstrated that calibration is crucial and in practice it should be targeted at a narrower set of representative instances.
Publisher
Springer Science and Business Media LLC
Subject
Artificial Intelligence,Industrial and Manufacturing Engineering,Software
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献