1. Allahverdi, A. (2015). The third comprehensive survey on scheduling problems with setup times/costs. European Journal of Operational Research,246, 345–378.
2. Al-Salem, A. (2004). Scheduling to minimize makespan on unequal parallel machines with sequence dependent setup times. Engineering Journal of the University of Qatar,17, 177–187.
3. Arnaout, J.-P. (2016). Worm optimization for the traveling salesman problem. In G. Rabadi (Ed.), Heuristics, meta-heuristics and approximate methods in planning and scheduling, international series in operations research & management science. Switzerland: Springer.
4. Arnaout, J.-P. (2017). Worm optimization for the multiple level warehouse layout problem. Annals of Operations Research, 269, 29–51.
5. Arnaout, J.-P., ElKhoury, C., Karayaz, G. (2017). Solving the multiple level warehouse layout problem using ant colony. Operational Research: An International Journal, 1–18.