Author:
Moon Ilkyeong,Lee Sanghyup,Shin Moonsoo,Ryu Kwangyeol
Publisher
Springer Science and Business Media LLC
Subject
Artificial Intelligence,Industrial and Manufacturing Engineering,Software
Reference64 articles.
1. Alfieri, A. (2009). Workload simulation and optimization in multi-criteria hybrid flowshop scheduling: A case study. International Journal of Production Research, 47(18), 5129–5145.
2. Bailey, R. (1996). Human performance engineering: Designing high quality professional user interfaces for computer products, applications and systems. Englewood Cliffs, NJ: Prentice-Hall.
3. Barnes, J., & Laguna, M. (1993). A tabu search experience in production scheduling. Annals of Operations Research, 41, 141–156.
4. Blazewicz, J., & Lenstra, J. (1983). Scheduling subject to resource constraints: Classification and complexity. Discrete Applied Mathematics, 5, 11–24.
5. Boctor, F. (1996). A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes. European Journal of Operational Research, 90, 349–361.
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献