Abstract
AbstractIn the early 2000s, shipyards in South Korea were the most competitive in the world for commercial vessels because of their accumulated production and quality management capabilities. In the mid-2000s, the rising trend of international oil prices and predicted market growth of offshore structures caused large shipyards in South Korea to start focusing on the construction of offshore structures. However, these shipyards suffered massive losses because they did not properly reflect the characteristics of offshore structures, which differ from those of commercial vessels. Such losses can largely be classified into engineering losses and production losses. This study aimed to address problems related to outfitting installation work from a production perspective. An algorithm was developed to define an efficient spool installation sequence and was verified through actual data of offshore structure. The developed algorithm should make it possible to plan spool installation work by determining an efficient spool installation sequence. In addition, the algorithm can assist in prompt decision making and eliminate wasted cost and time by providing with an efficient spool installation sequence.
Funder
Seoul National University
Korea Evaluation Institute of Industrial Technology
Publisher
Springer Science and Business Media LLC
Subject
Mechanical Engineering,Mechanics of Materials,Ocean Engineering,Oceanography
Reference12 articles.
1. Lee JM, Jeong YK, Woo JH (2018) Development of an evaluation framework of production planning for the shipbuilding industry. Int J Comput Integr 31:831–847
2. Woo JH, Kim YM, Jeong YK, Shin JG (2017) A research on simulation framework for the advancement of supplying management competency. J Ship Prod Des 32(1):60–79
3. Kim S (2015) The three heavy industries operating loss sharply [online]. Monthlymaritimekorea.com. https://www.monthlymaritimekorea.com/news/articleView.html?idxno=16199
4. Korea Energy Economics Institute (2015) A proposal for offshore plant of Korea resource development. KEEI, Ulsan
5. Ham DK, Back MG, Park JG, Woo JH (2016) A study of piping leadtime forecast in offshore plant’s outfittings procurement management. J Soc Nav Archit 53(1):29–36
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献