Development of Entering Order and Work-Volume Assignment Algorithms for the Management of Piping Components in Offshore Structure Construction

Author:

Park Jung GooORCID,Kim Ho Jung,Woo Jong Hun

Abstract

In the early 2010s, with rising oil prices and increasing purchase orders for offshore structures for deep-sea resource development, the shipyards that took these orders suffered unexpected losses. Unlike the construction of commercial carrier vessels, the construction of offshore structures necessary to develop deep-sea resources is difficult to manage due to the complexity of the outfitting process of the topside structure, which is a plant for gas and oil production and treatment. Piping components in particular, which comprise most of the design items, are difficult to manage because they involve 2 to 3 times the man-hours and up to 10 times the quantity of items compared to commercial carrier vessels. Due to not only high man-hours and quantity but also large fluctuations caused by design changes and long procurement lead times, process delays that result in delayed compensation frequently occurred. In response, Samsung Heavy Industries developed an integrated management system for piping components. This study describes the entering order optimization algorithm and work-volume assignment optimization algorithm, which are the core algorithms of this system. The entering order optimization algorithm determines the optimal installation order considering the procurement status of the piping components and the installation readiness status of the installation work site, through which it determines the entering order of the piping components. The algorithm seeks to accelerate the completion rate of installation of the piping components. Next, to minimize delivery delays of sub-contractors to the shipyard, this study developed a work-volume assignment optimization algorithm that can equalize the load on multiple sub-contractors considering the raw material readiness status and the production capacity of the sub-contractors, in terms of materials that must be ordered from external sub-contractors among the piping components whose entering order was determined. Finally, applying the algorithm developed using actual shipyard data resulted in an accelerated completion rate of installation and improved balance of load in terms of volume assigned to the sub-contractors.

Publisher

MDPI AG

Subject

Ocean Engineering,Water Science and Technology,Civil and Structural Engineering

Reference28 articles.

1. Productivity Improvement Strategies Using Simulation in Offshore Plant Construction

2. Offshore platforms;Speight,2014

3. Integration of evolutional BOMs for design of ship outfitting equipment

4. A study on the engineering support system for offshore outfitting design;Park;Adv. Sci. Technol. Lett.,2013

5. Estimation of man-hours for fabrication of ships and offshore platforms;Westby;J. Ship Prod.,2009

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3