1. Abril M, Salido MA, Barber F, Ingolotti L, Lova A, Tormos MP (2005) A heuristic technique for the capacity assessment of periodic trains. In: Proceedings of the 2005 conference on artificial intelligence research and development. IOS Press, Amsterdam, pp 339–346. ISBN: 1-58603-560-6 (cited on pages 27, 32)
2. Abril M, Barber F, Ingolotti L, Salido MA, Tormos MP, Lova A (2008) An assessment of railway capacity. Transp Res Part E Logist Transp Rev 44(5):774–806.
https://doi.org/10.1016/j.tre.2007.04.001
(cited on pages 28, 31, 32)
3. Armstrong J, Preston J, Hood I (2015) Evaluating capacity utilisation and its upper limits at railway nodes. In: Proceedings of the 13th conference on advanced systems in public transport (CASPT2015), Rotterdam (cited on page 32)
4. Bešinović N, Goverde RMP, Quaglietta E (2017) Microscopic models and network transformations for automated railway traffic planning. Comput Aided Civ Inf Eng 32(2):89–106.
https://doi.org/10.1111/mice.12207
(cited on page 29)
5. Büker T, Seybold B (2012) Stochastic modelling of delay propagation in large networks. J Rail Transp Plann Manage 2(1–2):34–50.
https://doi.org/10.1016/j.jrtpm.2012.10.001
(cited on page 26)