Author:
Memari Ashkan,Rahim Abdul Rahman Bin Abdul,Ahmad Robiah Binti
Publisher
Springer International Publishing
Reference20 articles.
1. Monden, Y.: Toyota production system: an integrated approach to just-in-time, 4th edn. CRC Press (1998)
2. Pyke, D.F., Cohen, M.A.: Push and pull in manufacturing and distribution systems. Journal of Operations Management 9(1), 24–43 (1990)
3. Hopp, W.J., Spearman, M.L.: To pull or not to pull: what is the question? Manufacturing & Service Operations Management 6(2), 133–148 (2004)
4. Orlicky, J.A.: Material requirements planning: the new way of life in production and inventory management. McGraw-Hill, Inc. (1974)
5. Hirakawa, Y., Hoshino, K., Katayama, H.: A hybrid push/pull production control system for multi-stage manufacturing processes. In: Achieving Competitive Edge Getting Ahead Through Technology and People, pp. 341–346. Springer London (1991)
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献