Author:
Hirakawa Yasuhiro,Hoshino Kyoji,Katayama Hiroshi
Reference8 articles.
1. Kimura, O. and Terada, H. Design and Analysis of Pull System, a method of multistage production control, Int. J. Prod. Res., 1981, Vol 19, No 3, pages 241–253.
2. Krajewski, L.J., King, B.E. and Ritzman, L.P. Kanban MRP and Shaping the Manufacturing Environment, Manage. Sci., 1987, Vol 33, No 1, pages 39–57.
3. Deleersnyder, J., Hodgson, T.J., Muller, H. and O’grady, P.J. Kanban controlled pull systems: An analytic approach, Manage. Sci., 1989, Vol.35, No.9, pages 1079–1091.
4. Spearman, M.L., Woodruff, D.L. and J. Hopp, W.J. CONWIP: a pull alternative to kanban, Int. J. Prod. Res., 1990, Vol 28, No 5, pages 879–894.
5. Hoshino, K., Muramatsu, R. and Soshiroda, M. A Study on the Choice of Fixed-Interval Ordering System and Fixed-Size Ordering System, Journal of Japan Industrial Management Association, 1975, Vol 26, No 3, pages 238–243.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献