1. Anwar, M.F., Nagi, R.: Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies. Int. J. Prod. Res. 36(3), 653–681 (1998)
2. Babu, A.G., Jerald, J., Noorul Haq, A., Muthu Luxmi, V., Vigneswaralu, T.P.: Scheduling of machines and automated guided vehicles in fms using differential evolution. Int. J. Prod. Res. 48(16), 4683–4699 (2010)
3. Bilge, U., Ulusoy, G.: A time window approach to simultaneous scheduling of machines and material handling system in an fms. Oper. Res. 43(6), 1058–1070 (1995)
4. Billaut, J., Tacquard, C., Martineau, P.: Modeling fms scheduling problems as hybrid flowshop scheduling problems. Stud. Inf. Control. 6(1), 25–30 (1997)
5. Braga, R.A.M., Rossetti, R.J.F., Reis, L.P., Oliveira, E.C.: Applying multi-agent systems to simulate dynamic control in flexible manufacturing scenarios. In: European Meeting on Cybernetics and Systems Research, vol. 2, pp. 488–493. A.S.C.S (2008)