Author:
Zhong Ling-Chong,Qian Bin,Hu Rong,Zhang Chang-Sheng
Publisher
Springer International Publishing
Reference13 articles.
1. Pasupathy, T., Rajendran, C., Suresh, R.K.: A multi-objective genetic algorithm for scheduling in flow shop to minimize the makespan and total flow time of jobs. Int. J. Adv. Manuf. Technol. 27, 804–815 (2006)
2. T’kindt, V., Billiaut, J.-C.: Multicriteria scheduling problems: a survey. RAIRO Oper. Res. 35, 143–163 (2001)
3. Wang, L.J., Yin, Y.L., Zhong, Y.W.: Cuckoo search with varied scaling factor. Front. Comput. Sci. China 9(4), 623–635 (2015)
4. Aziz, O., Belaïd, A., Yang, X.: Discrete Cuckoo search applied to job shop scheduling problem. Recent Adv. Swarm Intell. Evol. Comput. 585, 121–137 (2015)
5. Xu, Y., Wang, L., Wang, S.Y., Liu, M.: An effective shuffled frog-leaping algorithm for solving the hybrid flow-shop scheduling problem with identical parallel machines. Eng. Optim. 45, 1409–1430 (2013)
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献