Subject
Management Science and Operations Research,Computer Science Applications,Theoretical Computer Science
Reference105 articles.
1. Scheduling jobs with different, job-dependent earliness and tardiness penalties using the SLK method
2. Minimizing the Weighted Sum of Late and Early Completion Penalties in a Single Machine
3. D. Alcaide, J. Riera and J. Sicilia, An approach to solve bicriterion flow-shop scheduling problems, inProc. of the 6th International Workshop on Project Management and Scheduling (PMS'98).Istanbul, Turkey (1998) 151-154.
4. Two parallel machine sequencing problems involving controllable job processing times
5. M. Azizoglu, S.K. Kondakci and M. Koksalan,Bicriteria scheduling: Minimizing flowtime and maximum earliness on a single machine, edited by J. Climaco, Multicriteria Analysis. Springer-Verlag (1997) 279-288.
Cited by
66 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献