Author:
Fink Andreas,Homberger Jörg
Publisher
Springer International Publishing
Reference34 articles.
1. Adhau S, Mittal ML, Mittal A (2012) A multi-agent system for distributed multi-project scheduling: an auction-based negotiation approach. Eng Appl Artif Intel 25:1738–1751
2. Agnetis A, Pacciarelli D, Pacifici A (2007) Combinatorial models for multi-agent scheduling problems. In: Levner E (ed) Multiprocessor cheduling: theory and applications. I-Tech Education and Publishing, Vienna, pp 21–46
3. Araúzo JAA, Galán JM, Pajares J, López-Paredes A (2009) Multi-agent technology for scheduling and control projects in multi-project environments. An auction based approach. Intel Artif 13:12–20
4. Araúzo JA, Pajares J, Lopez-Paredes A (2010) Simulating the dynamic scheduling of project portfolios. Simul Model Pract Theory 18:1428–1441
5. Brucker P, Drexl A, Möhring R, et al (1999) Resource-constrained project scheduling: notation, classification, models, and methods. Eur J Oper Res 112:3–41
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献