Author:
Rieck Julia,Zimmermann Jürgen
Publisher
Springer International Publishing
Reference38 articles.
1. Ahuja HN (1976) Construction performance control by networks. Wiley, New York
2. Ballestín F, Schwindt C, Zimmermann J (2007) Resource leveling in make-to-order production: modeling and heuristic solution method. Int J Oper Res 4:50–62
3. Bandelloni M, Tucci M, Rinaldi R (1994) Optimal resource leveling using non-serial dynamic programming. Eur J Oper Res 78:162–177
4. Bartusch M, Möhring R, Radermacher F (1988) Scheduling project networks with resource constraints and time windows. Ann Oper Res 16:201–240
5. Burgess AR, Killebrew JB (1962) Variation in activity level on a cyclical arrow diagram. Int J Ind Eng 2:76–83
Cited by
23 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献