1. Baker, A.D.: A Survey of Factory Control Algorithms That Can Be Implemented in a Multi-Agent Heterarchy: Dispatching, Scheduling, and Pull. Journal of Manufacturing Systems 17(4), 297–320 (1998)
2. Baker, J.R., McMahon, G.B.: Scheduling the General Job-Shop. Management Science 31(5), 498–594 (1985)
3. Davis, L.: Job Shop Scheduling with Genetic Algorithms. Int’l Conf. on Genetic Algorithms and Their Application, Pittsburgh, PA, 136–140 (1985)
4. Della Croce, F., Menga, G., Tadei, R., Cavalotto, M., Petri, L.: Cellular Control of Manufacturing Systems. Eurapean Journal of Operational Research 69, 489–509 (1993)
5. Duffie, N.A., Piper, R.S., Humphrey, B.J., Hartwick, J.P.: Hierarchical and Non-Hierarchical Manufacturing Cell Control with Dynamic Part-Oriented Scheduling. Proc. of the 14th North American Mfg. ResearchConf., Minneapolis, 504–507 (1986)