Author:
Zhang Zhicong,Zheng Li,Weng Michael X.
Publisher
Springer Science and Business Media LLC
Subject
Industrial and Manufacturing Engineering,Computer Science Applications,Mechanical Engineering,Software,Control and Systems Engineering
Reference27 articles.
1. Liaw C-F, Lin Y-K, Cheng C-Y, Chen M (2003) Scheduling unrelated parallel machines to minimize total weighted tardiness. Comput Oper Res 30(12):1777–1789
2. Kim D-W, Na D-G, Chen FF (2003) Unrelated parallel machine scheduling with setup times and a total weighted tardiness objective. Robot Cim-Int Manuf 19(1–2):173–181
3. Rachamadugu RV, Morton TE (1981) Myopic heuristics for the single machine weighted tardiness problem. Working paper #28-81-82, Graduate School of Industrial Administration, Carnegie-Mellon University, Pittsburgh, Pennsylvania
4. Volgenant A, Teerhuis E (1999) Improved heuristics for the n-job single-machine weighted tardiness problem. Comput Oper Res 26(1):35–44
5. Carroll DC (1965) Heuristic sequencing of jobs with single and multiple components. PhD thesis, Sloan School of Management, MIT, Cambridge, Massachusetts
Cited by
51 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献