1. Albiach, J., Sanchis, J. M., & Soler, D. (2007). An asymmetric tsp with time windows and with time-dependent travel times and costs: an exact solution through a graph transformation. European Journal of Operational Research. doi: 10.1016/j.ejor.2006.09.099 .
2. Alidaee, B., & Womer, N. K. (1999). Scheduling with time dependent processing times: review and extensions. Journal of the Operational Research Society, 50, 711–720.
3. Barketau, M. S., Cheng, T. C. E., & Ng, C. T. (2005). Batch scheduling of step deteriorating items. Working paper, Department of Logistics, The Hong Kong Polytechnic University.
4. Bigras, L. P., Gamache, M., & Savard, G. (2006). The time-dependent traveling salesman problem and single machine scheduling problems with sequence dependent setup times. Les Cahiers du GERAD, G-2006-15.
5. Cheng, T. C. E., & Ding, Q. (2001). Single machine scheduling with step-deteriorating processing times. European Journal of Operational Research, 134, 623–630.