Author:
Estévez-Fernández Arantza,Mosquera Manuel A.,Borm Peter,Hamers Herbert
Publisher
Springer Science and Business Media LLC
Subject
Artificial Intelligence,Management Science and Operations Research,General Engineering,Software
Reference26 articles.
1. Allahverdi, A. (1996). Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness. Computers & Operations Research, 23(10), 909–916.
2. Allahverdi, A., & Savsar, M. (2001). Stochastic proportionate flowshop scheduling with setups. Computers & Industrial Engineering, 39(3), 357–369.
3. Bondareva, O. N. (1963). Some applications of linear programming methods to the theory of cooperative games. Problemy Kibernitiki, 10, 119–139 (in Russian).
4. Borm, P., Fiestras-Janeiro, G., Hamers, H., Sánchez, E., & Voorneveld, M. (2002). On the convexity of games corresponding to sequencing situations with due dates. European Journal of Operational Research, 136, 616–634.
5. Calleja, P., Borm, P., Hamers, H., Klijn, F., & Slikker, M. (2002). On a class of parallel sequencing situations and related games. Annals of Operations Research, 109, 263–276.
Cited by
17 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献