Affiliation:
1. Department of Industrial Engineering and Management Ben‐Gurion University of the Negev Beer‐Sheva Israel
Abstract
AbstractWe study a set of scheduling problems in a distributed flow‐shop scheduling system consisting of several flow‐shop production systems (factories) working in parallel. Our objective is to assign the jobs to the factories, and to devise a job schedule for each of the factories such that the weighted number of jobs completed in just‐in‐time mode is maximized. We classify computational complexity of the problems, including the special cases of unit weights and job‐ or machine‐independent processing times.
Subject
Management Science and Operations Research,Ocean Engineering,Modeling and Simulation
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献