Author:
Tan Yi,Mönch Lars,Fowler John W.
Publisher
Springer Science and Business Media LLC
Subject
Artificial Intelligence,Management Science and Operations Research,General Engineering,Software
Reference46 articles.
1. Amin-Naseri, M. R., & Beheshti-Nia, M. A. (2009). Hybrid flow shop scheduling with parallel batching. International Journal of Production Economics, 117(1), 185–196.
2. Bellanger, A., & Oulamara, A. (2009). Scheduling hybrid flowshop with parallel batching machines and compatibilities. Computers & Operations Research, 36(6), 1982–1992.
3. Bilyk, A., Mönch, L., & Almeder, C. (2014). Scheduling jobs with ready time and precedence constraints on parallel batch machines using metaheuristics. Computers & Industrial Engineering, 78, 175–185.
4. Chen, C.-L., & Chen, C.-L. (2008). Bottleneck-based heuristic to minimize tardy jobs in a flexible flow line with unrelated parallel machines. International Journal of Production Research, 42(1), 165–181.
5. Chen, C.-L., & Chen, C.-L. (2009). bottleneck-based heuristic to minimize total tardiness for the flexible flow line with unrelated parallel machines. Computers & Industrial Engineering, 56, 1393–1401.
Cited by
41 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献