Author:
Amin-Naseri Mohammad Reza,Beheshti-Nia Mohammad Ali
Subject
Industrial and Manufacturing Engineering,Management Science and Operations Research,Economics and Econometrics,General Business, Management and Accounting
Reference37 articles.
1. Acero-Dominguez, M.J., Paternina-Arboleda, C.D., Scheduling jobs on a K-stage flexible flow shop using a TOC-based (bottleneck) procedure. In: Systems and Information Engineering Design Symposium, 2004, pp. 295–298.
2. Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints;Allaoui;Computers and Industrial Engineering,2004
3. A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation;Bertel;European Journal of Operational Research,2004
4. Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness;Botta-Genoulaz;International Journal of Production Economics,2000
5. A new approach to solve hybrid flow shop scheduling problems by artificial immune system;Engin;Future Generation Computer Systems,2004
Cited by
32 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献