Author:
Boland Natashia,Dumitrescu Irina,Froyland Gary,Kalinowski Thomas
Funder
Australian Research Council
Publisher
Springer Science and Business Media LLC
Subject
General Mathematics,Software
Reference38 articles.
1. Artstein, Z., Wets, R.J.-B.: Sensors and information in optimization under stochastic uncertainty. Math. Oper. Res. 28, 523–547 (1993)
2. Asamov, T., Ruszczynński, A.: Time-consistent approximations of risk-averse multistage stochastic optimization problems. Math. Progr. 1–35 (2014). doi:
10.1007/s10107-014-0813-x
3. Bertsimas, D., Georghiou, A.: Design of near optimal decision rules in multistage adaptive mixed-integer optimization. Oper. Res. 1–18 (2015). doi:
10.1287/opre.2015.1365
4. Birge, J.R., Louveaux, F.: Introduction to Stochastic Programming. Springer, Berlin (1997)
5. Boland, N., Dumitrescu, I., Froyland, G.: A multistage stochastic programming approach to open pit mine production scheduling with uncertain geology. Optim. Online (2008).
http://www.optimization-online.org/DB_FILE/2008/10/2123.pdf
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献