1. HAX, A.C. and CONDEA, D. (1984) Production and Inventory Management, Prentice-Hall, Englewood Cliff, NJ.
2. SCHWEITZER, P.J. and SEIDMANN, A. (1991) Optimizing processing rates for flexible manufacturing system, Mgmt. Sci. 37, PP. 454–466.
3. DROZDA, T.J. and WICK, C. (Eds.) (1983) Tool and Manufacturing Engineers Handbook, Vol 1 Soc. of Mechanical Eng. Dearborn, 71.
4. CONRAD and CLAMROCK, (1987) The drilling problem A stochastic modeling and control example in manufacturing IEEE Trans II, PP. 947–958.
5. SETHI, A.K. and SETHI, P.S. (1990) Flexibility in manufacturing a Survey. Int. J. Flexible Manuf. System 2, PP. 289–328.