Author:
Jäger Sven,Leithäuser Neele,Velten Sebastian,Weiß Christian
Publisher
Springer International Publishing
Reference10 articles.
1. Allahverdi, A. (2015). The third comprehensive survey on scheduling problems with setup times/costs. European Journal of Operational Research, 246(2), 345–378. https://doi.org/10.1016/j.ejor.2015.04.004
2. Fu, L. L., Aloulou, M. A., & Triki, C. (2017). Integrated production scheduling and vehicle routing problem with job splitting and delivery time windows. International Journal of Production Research, 55(20), 5942–5957. https://doi.org/10.1080/00207543.2017.1308572
3. Gurobi Optimization, LLC. (2022). Gurobi optimizer reference manual. https://www.gurobi.com
4. IBM Deutschland GmbH. (2022). IBM ILOG CPLEX optimization studio. https://www.ibm.com/de-de/products/ilog-cplex-optimization-studio
5. IBM Deutschland GmbH. (2022). IBM ILOG CPLEX optimization studio reference manual. https://www.ibm.com/docs/en/icos/20.1.0?topic=interfaces-c-interface-referencemanual