Author:
Marinho António J.,Couto João P.
Publisher
Springer International Publishing
Reference38 articles.
1. Zidane, Y. J.-T., & Andersen, B. (2018). The top 10 universal delay factors in construction projects. International Journal of Managing Projects in Business, 11. https://doi.org/10.1108/IJMPB-05-2017-0052
2. Bekithemba, M., Godfrey, O. E., Cletus, M., & Adriaan, P. (2017). Profiling causative factors leading to construction project delays in the United Arab Emirates. Engineering Construction and Architectural Management, 24, 346–376. https://doi.org/10.1108/ECAM-05-2015-0072
3. Szymański, P., Szymanski, P., & Szymański, P. (2017). Risk management in construction projects. Procedia Engineering, 208, 174–182. https://doi.org/10.1016/j.proeng.2017.11.036
4. Chakrabarti, M. K. R. D. (2011). ProjectManagement.com—Risk management: A real challenge for the construction sector (2011).
5. PMI. (2009). Practice standard project risk management (p. 107). Project Management Institute.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献